Jehangir Chowk to Rambagh Flyover | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
“Construction of Flyover / Express-way Corridor from Jehangir Chowk to Rambagh – Srinagar City”. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Jehangir Chowk to Rambagh Flyover | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Phase I of the Jehangir Chowk Rambagh flyover stretching from Amar Singh College to Barzulla Completed Work on Phase II of the flyover is in progress |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Background.
1)
On the basis of detailed topographic and traffic
surveys conducted by DHV India, a concept plan of the above mentioned project
was prepared. Animated presentations of the concept plan were prepared and
presented to the authorities of J&K ERA. After three presentations to the
authorities and two presentations to Hon’ble Chief Minister, concept plan was
finally approved.
2)
On the basis of the approved concept plan, DHV India
prepared the layout plan and General
Arrangement Drawings. These were referred to RITES for review on 04-08-2010.
With minor modification for traffic movement at Jehangir Chowk,
RITES recommended
adoption of the concept plan.
3)
Structural design and drawings prepared for the project
on the basis of the concept plan,
were reviewed and approved by IIT Roorkee in April 2011.
4)
The project starts from the heart of city at Jehangir
Chowk (near High Court) and passes
through the congested urban area along the IG (Air port) road terminating at Barzulla Bridge. The total linear
length of the corridor is around 2.50 Km. The salient features of the project
are as under:
·
4- Lane divided elevated expressway
from Jehangir Chowk to Rambagh Bridge.
·
2
major bridges, each of 2-lane carriageway width, over flood spill channel at
Rambagh on either side of existing
bridge.
·
2-lane elevated road from Rambagh
bridge to Rambagh (beyond Y-Intersection at Natipora Chowk) on Airport road.
·
At Jehangir Chowk an upward ramp for
traffic from Jehangir Chowk to Rambagh and a downward ramp for traffic from
Rambagh to Jehangir Chowk.
·
Integrating existing Flyover with
proposed elevated expressway at Jehangir Chowk for left turning traffic from Dal
Gate to Rambagh.
·
At Bakshi Stadium Chowk a left turn
upward ramp from Jawahar Nagar road to Rambagh and downward ramp for traffic
coming from Rambagh.
·
To and fro connection to the
elevated expressway for traffic on Natipora road by providing down ward ramp on
LHS from Natipora Y-Junction and upward ramp on RHS starting from Natipora
Y-Junction.
·
Widening and strengthening of 2-lane
road at grade on both sides of proposed elevated
expressway.
·
Provision of minimum 1.50 meter wide
drain-cum-footpath on both sides.
·
Provision of electrification and
lighting arrangement for the entire sub- project stretch.
5)
The
benefits
from implementation of the project are as under:
·
Decongestion of traffic.
·
Improved air quality.
·
Time & fuel saving.
6)
The
project is estimated to cost Rs.256.65 crores
as per the Summary Appriasal Report (SAR) submitted to ADB under
tranche-2 of J&K Urban Sector Development Infrastructure Program (JKUSDIP).The
cost is indicative and may enhance.
7)
The
project involves
acquisition of land to the extent of around 46 kanals and 60 structures (mostly
commercial establishments). Out of 46 kanals of land, around 9.50 kanals are
required for rehabilitation of
people permanently displaced by the project, while the rest of the land falls in
the alignment of the expressway (road-widening).
8)
As per the Loan-Agreement with the ADB,
the State Government/ ERA is required to adequately compensate the people
affected by the project. The project dislocates 285 shop-keepers permanently,
besides impacting some other establishments, mostly Government departments. The
Resettlement-Plan envisages compensation to the owners/title-holders for the
assets acquired and rehabilitation of displaced persons (owners /tenants).The
rehabilitation could be project-assisted or self-relocation i.e compensation in
the form of liquid cash as per the entitlement of the concerned people in the
asset /property to be acquired. As regards project-assisted rehabilitation,
Government/ERA has already worked out a scheme that provides for construction of
two commercial complexes, one near Exhibition Grounds (Jehangir Chowk) and
another at Ram Bagh. These complexes
will together accommodate 186
project dislocated shopkeepers. In addition to these two complexes, Srinagar
Municipal Corporation is rehabilitating 99 shopkeepers of Cheap & Kabaddi
Markets located in the alignment of the Flyover.
9)
The State
Government has constituted a High Level Committee, headed by the Divisional
Commissioner, Kashmir for speedy implementation of the Resettlement Plan. The
Committee has constituted a Sub-Committee for negotiations
with the concerned parties/ stake-holders. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||